日本牲交大片免费观看_久久精品亚洲AV无码四区牛牛_伊人色综合久久精品网_日韩精品久久久久_亚洲欧美日本另类_韩国日本亚洲欧洲一区二区三区

Welcome to Hashimoto Precision Metal (Shenzhen) Ltd

Mailbox:

info@hskcoltd.com

Hashimoto Precision Metal (Shenzhen) Ltd

Specialize in precision stamping parts since 1935
News
Your position: Home > News > Industry news > Preparation work before precision metal stamping

Contact us

Hashimoto Precision Metal (Shenzhen) Ltd

Address: No. 25, Xinfa East Road, Xiangshan Community, Xinqiao street, Bao'an District, Shenzhen 518125, P.R.China

Tel: +86-755-27267875

Email: info@hskcoltd.com

Industry news

Preparation work before precision metal stamping
Release time:2024-01-29Views:1511


In the production process of precision metal stamping, the preparatory work in the early stage is the key to ensuring product quality and production efficiency. Adequate preparation can not only reduce production costs, but also ensure the smooth progress of the production process. The following are several important preparations that need to be done before stamping.


Firstly, the design phase is the foundation before precision metal stamping. Engineers need to use computer-aided design (CAD) software to draw precise drawings of products and make corresponding molds based on these drawings. The design of the mold should take into account metal flow, punching pressure distribution, and material rebound characteristics to achieve accurate control of part size and shape.


Next, after the mold manufacturing is completed, a trial mold needs to be conducted. This process can identify potential design defects or manufacturing errors, such as burr generation, crack propagation, and other issues. Only after passing the trial mold can the mold be put into mass production.


In addition, material selection is also crucial. Select appropriate metal materials according to product requirements and ensure that the flatness, hardness, and composition of the materials meet the requirements of precision stamping. If necessary, pre-treatment of materials such as cleaning, degreasing, straightening, etc. is also necessary to ensure their quality stability during the stamping process.


In terms of stamping equipment, it is necessary to check whether the performance of the press meets the processing requirements, including its tonnage, stroke, speed and other parameters. At the same time, it is also necessary to ensure that all parts of the press, such as the slider, guide rail, safety device, etc., are in good condition.


The technical level and experience of operators are also important factors affecting the quality of precision metal stamping. Therefore, providing professional training to operators to familiarize them with equipment operating procedures and product quality standards is an indispensable preparatory step.


In summary, the preparation work before precision metal stamping involves multiple stages such as mold design and manufacturing, material selection and pretreatment, equipment inspection and maintenance, and personnel training. These tasks are interrelated and together form the cornerstone of high-quality stamping products. Only meticulous and thoughtful preparation can ensure the smooth progress of precision metal stamping technology, thereby producing products that meet expectations.


Inquire Now * required
Submit
新民市| 佛冈县| 锡林郭勒盟| 新邵县| 枣庄市| 固安县| 信阳市| 石阡县| 沙河市| 高淳县| 靖安县| 昌乐县| 平舆县| 建瓯市| 东港市| 刚察县| 息烽县| 铜川市| 和平县| 襄垣县| 澄江县| 晋宁县| 龙泉市| 佛坪县| 额济纳旗| 洛川县| 德清县| 从江县| 肥西县| 贞丰县| 山西省| 六枝特区| 舒城县| 成都市| 深泽县| 阿瓦提县| 行唐县| 兴和县| 东乡| 二手房| 黑河市|