日本牲交大片免费观看_久久精品亚洲AV无码四区牛牛_伊人色综合久久精品网_日韩精品久久久久_亚洲欧美日本另类_韩国日本亚洲欧洲一区二区三区

Welcome to Hashimoto Precision Metal (Shenzhen) Ltd

Mailbox:

info@hskcoltd.com

Hashimoto Precision Metal (Shenzhen) Ltd

Specialize in precision stamping parts since 1935
News
Your position: Home > News > Industry news > Why choose stamping

Contact us

Hashimoto Precision Metal (Shenzhen) Ltd

Address: No. 25, Xinfa East Road, Xiangshan Community, Xinqiao street, Bao'an District, Shenzhen 518125, P.R.China

Tel: +86-755-27267875

Email: info@hskcoltd.com

Industry news

Why choose stamping
Release time:2022-07-11Views:2154


There are various ways of metal processing. If the volume is large and the accuracy requirement is relatively high, stamping will be selected. Stamping products are stable in dimension, light in weight, and have good surface condition and accuracy. As they depend on punches and molds, the production cycle is long and initial mold investment is large. There are three common types of stamping dies:

1)Single punching die: in one stroke of stamping, only one process can be completed, generally manual feeding

2)Continuous die: it is also translated as "progressive die". Two or more stamping processes are completed at the same time during one stroke of stamping

3)Composite mold: multiple materials are carried out simultaneously or multiple processes are conducted at the same time.


When the quantity of mass production is not large or the product has not been finalized, the early trial will be completed by prototype or single die, which can be at a lower cost. When the shape and specific dimensions of the product have been verified and can be batched, continuous die or composite die will be used. Because there will be a gap between theory and practice, the yield of raw materials and the matching degree of mold parts are not equal to the actual value. "Prank" action in the early mold trial stage is to find out the differences between the design and practice, repair or remake parts, in order to make the quality of the products completely consistent with the requirements of the drawings.


This cycle is determined according to the difficulty of the product. It can be done quickly at one time, whereas sometimes the mold in the R & D stage will take half a month or even more. This process is like the process of cocoon stripping, which is also like go see a doctor. In the eyes of the mold repairman, every steel plate has life. Under the skillful hands of punching, rubbing, grinding and knocking, each part can achieve the best clearance. By cooperating with each other, a satisfactory finished product can finally be produced.

Inquire Now * required
Submit
高台县| 沐川县| 自贡市| 定远县| 西宁市| 吉水县| 白朗县| 扎鲁特旗| 大邑县| 桦南县| 寿光市| 城口县| 偏关县| 永安市| 河津市| 莒南县| 郴州市| 兖州市| 海阳市| 东至县| 鄂托克前旗| 钦州市| 兰考县| 葫芦岛市| 宽甸| 瓦房店市| 石楼县| 大兴区| 陇川县| 宝应县| 新源县| 仁化县| 两当县| 德兴市| 托克托县| 新乡市| 雷波县| 崇信县| 廊坊市| 黑龙江省| 凤凰县|